Jounieh cruise terminal (Lebanon)
Harbour protection structures
Client: SEATEC sarl - Scales: 1/54 (2D) - 1/70 (3D)
Design optimization of the protection structures and stability study of the harbour’s breakwater:
- 2D study of overtopping and stability for the main breakwater (wave flume)
- 3D study (wave basin) of the whole harbour in a 40 m x 30 m basin, scale 1/70
Breakwater’s armour made of ACCROPODETM II units from 4 m3 to 16 m3
100-year sea state: Hm0 = 7.25 m, Tp = 15 s