Dahej LNG Terminal (India)
Terminal protection breakwater
Client: Ballast Nedam International - Scale: 1/56.5
Stability study of the roundhead of the breakwater protecting the terminal in wave flume (2D), then in wave basin (3D)
Armour of the breakwater made in ACCROPODETM of 6.3 m3 and 4 m3 on the seaside slope with a berm in cubic blocks of 8 m3 and ACCROPODETM of 2.5 m3 on the rear side
Stability tests for 100-year return period waves with effect of ebb current up to 2.5m/s