Barka fishery harbour (Oman)

Construction of the new fishery harbor

Client: Galfar Engineering & Contracting - Scale: 1/30

 

Main breakwater in construction | Artelia
Main breakwater in construction

Wave flume (2D) stability study and overtopping measurements concerning the main harbour jetty, protected with 1.3 and 1.5 m3 CORE-LOC™ units.

 

Overtoppings of the jetty in wave flume | Artelia hydraulics
Overtoppings of the jetty in wave flume